Operational: December 2016
Project description: Major upgrade of an existing building to house new wet labs, organic and inorganic analytical laboratories, a PC2 microbiological lab, a material science lab, a remediation lab, x-ray diffraction lab, ESEM lab, cool rooms and a QC2 receiving store.
Our Scope: Engineer and commission laboratory airflow control system with technology from Ebtron (thermal dispersion airflow measurement stations), Tridium and Phoenix Controls.
HVAC Constructor: Attack Air
Engineer: Wood & Grieve (Stantec)